Story date/status: 15 October 2026 announcement. Consultation scheduled for 3 November 2026. Source checked: 25 October 2026.

TL;DR

Dundee City Council is asking suppliers for input while its proposed construction framework arrangements are still being developed. For SMEs, this is the moment to explain which scope and lot choices affect their ability to bid.

What happened.

A Supplier Development Programme notice dated 15 October advertises Dundee's Construction Consultancy and Main Contractor Frameworks Consultation Event for Tuesday 3 November, 10am to 1pm, at Michelin Scotland Innovation Parc. Existing and prospective suppliers are invited, with SMEs in Tayside and Fife particularly encouraged. The council plans to discuss lot structures, scopes and procurement approaches. This is a consultation, not a contract award or a newly opened tender.

What it actually means.

Supplier engagement earns its place when it changes a buying decision. A room full of interested businesses is useful. A framework design that those businesses can realistically compete for is the more important result.

If I were preparing for this session, I would bring one specific example of a requirement that prevents a capable firm from bidding. Perhaps a package combines a specialist discipline with work the business cannot deliver. Perhaps the geography or mobilisation timetable makes the proposed scope impractical. Then I would show an alternative and explain its trade-offs for the council.

That is easier for a buyer to use than a general request to make procurement more SME-friendly. Smaller lots might widen participation, but they can also increase coordination work. The useful conversation connects supplier capacity with how the council intends to manage delivery.

For the buying team, the follow-through matters. Record which concerns led to a change, which did not, and why. A short explanation alongside the eventual procurement documents would help suppliers see what the consultation achieved. The notice reports an intention to gather feedback. It does not yet establish that the design has changed.

What to watch.

Watch whether the eventual lot structure and procurement documents explain how supplier feedback influenced the design, rather than simply recording that engagement took place.

FAQs

How do suppliers check attendance details?

Use the Eventbrite link in the original SDP notice. Confirm availability and the latest attendance arrangements with the organiser before travelling.

What should a supplier take to the consultation?

Bring a concrete delivery constraint, evidence of the work the firm can perform and a proposed adjustment. Explain the effect on competition, delivery risk or cost, rather than making a sales pitch.

Does attending secure a place on a framework?

The notice offers a chance to contribute to its design. It does not offer appointment. Treat any future procurement as a separate process and review its published requirements.